Well the DC is up and running and the systems have all been migrated over from the old building. As expected BT let us down with the SIP Trunking portion of the migration so we are having to run the complete corporate telephony system on re-directed numbers down 4 x ISDN lines.
The final parts of the DC Build are taking shape now and Saturday saw the delivery of the first of the generators. This caused a bit of local excitement as it had to be craned over the top of a four storey building and placed in a channel behind the building.
 |
| Crane ready to go |
 |
| Generator on board |
It was poetry in motion watching the crane experts place the engine exactly where we wanted it
 |
| Annoying Air Traffic control |
 |
Still Annoying ATC
|
Thankfully there was no wind to speak of, indeed it was the best day weather-wise this year and it was brought gently into place
No comments:
Post a Comment