Friday, 2 September 2011

Start of the New Build

Well as I reported earlier, there are a lot of projects in the pipeline that are going to make and keep me very busy for the next year at least.

The HVAC upgrade and addition for the Imperial Way 1 centre has now reached Final Design and BAFO stage so todayvwas spent crossingbt's etc and finishing my reportbforbthe Board.

A cool quarter of a million is required so that will test their mettle.

We have also officially launched the project to build Imperial Way 2, so yesterday was spent on a flying trip down to London from Edinburgh with a good friend and fine electrical designer, Steve, to cast an eye over the existing power distribution system. We thought we may be able to tap the incoming supply and split it across two sites, but as it is a packaged substation it would not be as straightforward as we would like. Webhave come away with some thoughts and hopefully will settle on one of them. More later